Nessie the Flip House: Week 9

I hope you enjoy these weekly updates as I navigate through the business of flipping houses one house at a time!!  Check in each Friday to see weekly update of how this house progresses!  To catch up on the progress on Nessie, check out her previous posts here.  If you’re new here (Hello!!!),  or just enjoy walking down memory lane, you can see my 6 previous flip houses here.  Thanks for coming along for the ride!!  

I feel like this house is a tortoise right now- slow and steady.  Steady progress is a good thing, so I can't complain too much.  This week, central air and all the ductwork was installed.

 

 

My electrician also got busy placing recessed lighting, locating outlets, switches, and working on rewiring essentially everything.

 

 

The most visible change, however is the framed out basement laundry/powder room!!  It's feeling like a room!  The pocket door still needs to be framed in, but it's pretty exciting to see this space.

 

 

At this phase, I'm racking my brain to make sure that I take every necessary item into consideration while the walls are open and things are still easy to tweak.  I'm eager for finishes, but there's lots of 'necessary evil' to take care of first behind the walls.

 

After a longer wait that I would like, I've been assured that the patio and exterior hardscaping repairs will be starting by Wednesday at the latest.

 

And on we chug, chug, along.

 

Happy autumn and have a great weekend!